Explore recent commercial construction projects in SC, including a new YMCA building and facilities in Oconee County. (Rendering/Goodwyn Mills Cawood)
Explore recent commercial construction projects in SC, including a new YMCA building and facilities in Oconee County. (Rendering/Goodwyn Mills Cawood)
Ross Norton // June 19, 2025//
Under Construction is a roundup of some of the recent and ongoing commercial construction projects going on across South Carolina. Architects, contractors, engineers and other players in the construction industry are welcome to submit projects with photos to SC Biz News.
Submit projects through our online forms in Charleston, Columbia and Greenville.
Upstate
Foothills Area YMCA Phase II Addition
370 Memorial Drive
Seneca
Developer/Owner: Foothills Area YMCA
Architect: Goodwyn Mills Cawood, Greenville
General contractor: Hogan Construction Group, Easley
Engineers: Land Planning Associates Inc., Easley (civil); Fuller Group Inc., Greenville (structural); Stephens Engineering & Consulting LLC, Easley (MEP and fire protection); Carolina Engineering Solutions, Greenville (electrical)
Estimated completion date: Spring 2026
Estimated total cost of project: $13.6 million
Project description: The addition of the Foothills Area YMCA includes a new indoor eight-lane, 25-yard pool with a large pool desk, a double gym with an elevated track, multi-purpose room with a warming kitchen, two administrative offices, second floor flexible program spaces, a lobby with reception desk, toilets, storage and support spaces.

Trade Bridge Business Park/S Batesville Road
1204 S. Batesville Road
Greer
Estimated total cost of project: $8.9 million
Project description: This modern industrial property features approximately 75,500 square feet of total space, including a 71,100-square-foot warehouse with 32-foot eave heights, three dock-high doors and a 20-by-16-foot drive-in door. Constructed with tilt-up concrete, the design maximizes efficiency and durability. The site spans 5.42 acres and includes a 1.15-acre truck court and auto parking.

Seneca Performing Arts Center
206 E. North 1st St.
Seneca
Owner: City of Seneca
Architect: Goodwyn Mills Cawood, Greenville
General contractor: Hogan Construction Group, Easley
Subcontractors: Edward Dugger & Associates, Stuart, Fla. (theater consultant)
Engineers: Goodwyn Mills Cawood, Greenville (civil); Britt Peters & Associates, Greenville (structural); Carolina Engineering Solutions, Greenville (MEP and fire protection)
Estimated completion date: 2026
Estimated total cost of project: $10 million
The New Seneca Center for the Arts will be a 700-seat performing arts theater designed to accommodate a variety of events from orchestral performances to plays and rock concerts. This new theater will become the new cultural center of Seneca and will include a new art gallery as well as a large pre-function space that can be used for events. These spaces are designed to maximize flexibility and can be used for a variety of purposes such as daily retail sales and special local events.
Lowcountry

Stokes KIA
202 S. Goose Creek Blvd.
Goose Creek
Developer/owner: Stokes KIA, Goose Creek
Architects: Glick/Boehm & Associates, Charleston
General contractor: Choate Construction, Mount Pleasant
Engineers: Cranston Engineering Group, Charleston (structural); DWG Engineering, Mount Pleasant (mechanical, electrical, plumbing); SeamonWhiteside, Mount Pleasant (civil)
Estimated completion date: Late summer 2025
Project description: Stokes Kia Moncks Corner is undergoing a renovation and expansion to meet Kia’s “change-up” standards. The project doubles the service shop capacity from 12 to 24 bays, adds three new detail bays and expands the service reception from two to three lanes. Updates include new interior finishes, a refreshed exterior façade and converting existing detail bays into a tech break room, locker room, and restroom area, designed to create a modern, efficient facility.

Suite 140 at River Oaks
4401 Leeds Ave., Suite 140
North Charleston
Developer/owner: Kenneth Seeger, Charleston
Architects: Loyal Architects, North Charleston
General contractor: J. Musselman Construction Inc., Charleston
Engineers: Barrett Woodyard & Associates, Norcross, Ga.
Estimated completion date: Complete
Project description: This project consists of an interior upfit on the first floor to create the new location of Pulte Home Design Center. Scope of work includes new partitions, flooring, casework, displays, ceilings, wood trim, painting, and mechanical, electrical and plumbing systems.

Suite 150 at River Oaks
4401 Leeds Ave., Suite 150
North Charleston
Developer/owner: Kenneth Seeger, Charleston
Architects: Loyal Architects, Charleston
General contractor: J. Musselman Construction Inc., Charleston
Engineers: Barrett Woodyard & Associates, Norcross, Ga.
Estimated completion date: Complete
Project description: This project is an interior upfit in an existing tenant area on the first floor of a four-story building. New flooring, casework, walls, interior trim and fire-alarm system have been installed. Other trades include mechanical, electrical and plumbing.
Midlands
Walmart #1183
2401 Augusta Road
West Columbia
Developer/owner: Walmart Stores Inc., Bentonville, Ark.
Architects: PB2 Architecture+Engineering, Rogers, Ark.
General contractor: McCrory Construction, Columbia
Engineers: Wallace Engineering Structural Consultant Inc., Tulsa (structural); PB2 Architecture+Engineering, Rogers, Ark. (mechanical, electrical, plumbing)
Estimated completion date: Second quarter 2025
Project description: This project entails significant renovations, including interior and exterior demolition, repairs to fencing, walls, flooring and ceilings, modifications to fire protection, plumbing, HVAC and electrical systems. Sitework includes new parking, re-grading of interior slabs, and removal and replacement of sidewalks.
Walmart #2214
5420 Forest Dr.
Columbia
Developer/owner: Walmart Stores, Inc., Bentonville, Ark.
Architects: Cuhaci & Peterson Architects LLC, Orlando
General contractor: McCrory Construction, Columbia
Engineers: Johnston Burkholder Associates, Kansas City, Kan. (structural); Cuhaci & Peterson Architects LLC, Orlando (electrical, mechanical, plumbing)
Estimated completion date: Second quarter 2025
Project description: This remodel includes extensive interior and exterior renovations, demolition, and upgrades to fire protection, plumbing, HVAC and electrical systems. Site improvements include new parking, regrading and sidewalk replacement. Enhancements also extend to key customer spaces, including the pharmacy, vision center, restrooms and a new mother’s room.